Skip to main content
Loading...

Slope Stabilization

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was installed along 400 feet of an eroded streambank. However, due to site limitations, the designers also needed a product to stabilize the steep, bare slope without removing existing trees. A compost-based “Living Wall” application was selected to establish vegetation and stabilize the slope.

Key Features:

  • Bioengineering
  • Bank stabilization
  • Filtrexx® Filtersoxx living wall
  • BFM hydroseeding

Other Similar Projects

Walter Bradley Park
|

In the heart of Midway is a well-loved park. Beginning in July of 2021, a partnership with the City of Midway, the Midway Parks Board and Friends of…

Read More
Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More