Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Springs Branch at Clays Mill Elementary
|

EcoGro, Fayette County Public Schools, and several project partners submitted a grant application for the LFUCG Stormwater Quality Incentive Grant…

Read More
Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More
Sunny Slope Farms
|

Originally purchased by the Sunny Slope Farms Homeowner’s Association in 2018, this riparian greenway sits on a 1.6-acre buffer between the

Read More