Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Lee's Branch
|

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was…

Read More
Coca-Cola Bottle Rain Garden
|

The Coca Cola rain garden is the first rain garden registered in the Bluegrass Rain Garden Alliance's "2,010 Rain Gardens by 2010" initiative. …

Read More
Brushy Creek
|

EcoGro was contracted to hydroseed native wildflower seeds on a 4+ acre stream restoration project conducted by another company. After work on the…