Dam Removal and River Restoration

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as a municipal water supply.  After 100 years the concrete had deteriorated, and the dam had been deemed unsafe.  With the dam also acting as a fish and mussel mitgration barrier and a potential hazard to boaters, the Village of West Milton decided to remove the dam and restore the Stillwater River.  The EcoGro/Ridgewater team was hired to carry out the removal of the 300+ ft wide dam and perform the subsequent Stillwater River Restoration.

Key Features:

  • Dam Removal
  • River Restoration
  • Endangered Mussel Relocation
  • Fish Migration Restored
  • Aquatic Habitat Enhancement

DESIGN AND CONSTRUCTION TEAM

Project Partners


Other Similar Projects

East Fork Little Sandy
|

EcoGro was hired as a subcontractor to install erosion controls and native plants on a stream restoration project in Lawrence County, Kentucky.

Read More
Hatchery Creek
|

The EcoGro, Ridgewater, Stantec Team worked to develop a stream mitigation project at the tailwaters of Lake Cumberland.

Read More
219 E Vine
|

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington.

Read More