Dam Removal and River Restoration

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as a municipal water supply.  After 100 years the concrete had deteriorated, and the dam had been deemed unsafe.  With the dam also acting as a fish and mussel mitgration barrier and a potential hazard to boaters, the Village of West Milton decided to remove the dam and restore the Stillwater River.  The EcoGro/Ridgewater team was hired to carry out the removal of the 300+ ft wide dam and perform the subsequent Stillwater River Restoration.

Key Features:

  • Dam Removal
  • River Restoration
  • Endangered Mussel Relocation
  • Fish Migration Restored
  • Aquatic Habitat Enhancement

DESIGN AND CONSTRUCTION TEAM

Project Partners


Other Similar Projects

UK Stadium View
|

It’s unusual to find a modern facility with a coal pile these days. Even rarer is an urban stormwater project built to treat it. The University…

Read More
Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More
Eastland
|

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated…

Read More