Stormwater Solutions

The city of Lexington’s Division of Parks and Recreation needed to address an eroding stormwater channel in the city’s newest public park. This property had previously been the staging area for the installation of a new sanitary sewer pump station. During the many months of construction activities, heavy equipment and piles of materials had compacted and smothered the soil. As a result, a protective cover of truf grass was difficult to establish after construction was finished. During the course of a few months, a shallow drainage ditch had eroded into a deep gully. Soil that washed out of the channel was accumulating in new stormwater structures downstream.

EcoGro was hired by Parks and Recreation to mitigate the eroding gully by installing stacked limestone boulders at headwalls, a rock conveyance and infiltration channel, a buffer of native grasses and wildflowers, nine shade trees for park amenities and prepare an area for future reforestation events. Our scope of work included three full growing seasons of stewardship to control weeds, monitor progress and ensure the planting is fully established.

Key Features:

  • Stacked rock headwalls
  • Design / Build stream channel
  • Native riparian planting
  • Pollinator habitat
  • Ongoing stewardship of riparian planting

Project Partners

LFUCG

Funding Partner


Other Similar Projects

Walnut Hill Club
|

The Walnut Hill Club at Chilesburg Owners Association was experiencing larger volumes of stormwater entering their property from surrounding areas.…

Read More
Gunpowder Creek
|

The Gunpowder Creek dam was originally constructed to serve as a water supply reservoir for the Camp Michaels Boy Scout Camp in Boone

Read More
Valley Park Stream Crossing
|

With citizens constantly crossing through the creek and a new sewer running under the creek, the stream crossing at Valley Park was a much needed…