Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Lambert Run MNF
|

EcoGro was hired to build High altitude wetlands that serve as both a natural filter for runoff and habitat for a diversity of aquatic and semi-…

Read More
Hartland Stream Restoration
|

Hartland Homeowners Association worked with Earthcycle Design to submit a proposalto rebuild a section of stream that was overgrown with invasive…

Read More
Blue Ridge Landfill
|

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a…

Read More