Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Springs Branch at Clays Mill Elementary
|

EcoGro, Fayette County Public Schools, and several project partners submitted a grant application for the LFUCG Stormwater Quality Incentive Grant…

Read More
LCM Amtek
|

Linden Long, owner of LCM Company, has seen his share of steep slopes. He claims that the problem is only getting worse due to the fact that people…

Read More
Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More