EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

UK FEMA Flood Mitigation Project
|

This project, designed by Bell Engineering, is intended to serve a dual-purpose as a passive park with stormwater management functions. As a $12,000,…

Read More
Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More
Coldstream SEP
|

As part of a Consent Decree settlement with US EPA and KY Division of Water, the Lexington-Fayette Urban County Government agreed to a $1 million…

Read More