EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More
Pond Creek
|

Pond Creek in Crockett County, Tennessee resembled a straightened ditch. A section of private property was acquired by the West Tennessee River Basin…

Read More
Walnut Hill Club
|

The Walnut Hill Club at Chilesburg Owners Association was experiencing larger volumes of stormwater entering their property from surrounding areas.…

Read More