Skip to main content
Loading...

Pond Bank Stabilization

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the pond had eaten away most of the turf grass and were leaving a mess with their droppings. The result was a case of very poor water quality. Decorative Kentucky native plants along the banks offer a prime example of restoring a balance for sediment control, nutrient management and water quality. The Lexington Green bank stabilization project shows that EcoGro can offer much more than what meets the eye.

Key Features:

  • Design/build
  • Bank stabilization
  • Water Quality
  • Native plants
  • Biodegradable products

Awards

LFUCG Environmental Commission Award


Other Similar Projects

Coldstream Park
|

The Cane Run watershed is designated as a resource protection area that feeds the drinking water supply for the city of Georgetown. As a 303d-listed…

Read More
Mill Creek
|

Fayette County Public Schools had the vision to improve 700 feet of Mill Creek in Lexington, Kentucky. The stream was an eroding, urban ditch that…

Read More
McConnells Spring
|

McConnells Spring Park is a designated Natural Areas Park in the heart of Lexington. The karst features that allow water to spring to the surface…

Read More