Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

LCM Amtek
|

Linden Long, owner of LCM Company, has seen his share of steep slopes. He claims that the problem is only getting worse due to the fact that people…

Read More
Blue Ridge Landfill
|

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a…

Read More
Sruth Fuisce Feasibility study
|

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and costestimate for improvements to a large pond in the Licking River…

Read More