Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Cove Spring
|

Because of its convenient location in downtown Frankfort, Cove Spring Park is not only an oasis for wildlife, but also the public. Over time, the…

Read More
Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
South Elkhorn Creek
|

In 2022, a feasibility study was done in the Clemens Heights subdivision to address erosion and water quality issues in South Elkhorn Creek. As a…