Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and cost estimate for improvements to a large pond in the Licking River watershed. This pond will be a key feature to be viewed from where the owner will build a new house. Although the pond is approximately 0.8 acres and receives drainage from about 18 acres, it was shallow and not filling to capacity. Erosion of the spillway had cut into the earthen dam and threatened to lower the pond level even further. Bush honeysuckle and growth around the pond blocked views. Runoff from agriculture added nutrients to the water and boosted algae. The shallow depth and minimal habitat could not fully support sport fishing. Because of the pond’s prominence, the owner wanted to see if and how it could be upgraded to a main attraction.


Project Partners


Other Similar Projects

UK FEMA Flood Mitigation Project
|

This project, designed by Bell Engineering, is intended to serve a dual-purpose as a passive park with stormwater management functions. As a $12,000,…

Read More
Falling Leaves Greenway
|

The need and appreciation for greenways in neighborhoods is increasing. Plus, a growing number of people understand how greenspaces serve as…

Read More
NUSEC Feasibility Study
|

Following years of urban expansion in Lexington, the South Elkhorn Creek was suffering from “urban stream syndrome”.

Read More