Rain Garden and Stormwater Drainage Improvements

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater improvements at its Wichita Kansas distribution facility. The property had suffered from persistent problems with runoff. Issues ranged from leaks along roof valleys, undersized downspout pipes and standing water in loading dock wells. The EcoGro team upgraded the drainage system and included a massive ¾ acre rain garden. This stormwater BMP is built to treat runoff from nearly 8 acres of the property’s impervious surfaces. A selection of native Kansas grasses and wildflowers will filter out non-point pollutants washing off the asphalt parking lot, sidewalks and rooftop.

Key Features:

  • Design and construction
  • Site drainage Improvements
  • Runoff reduction
  • Water quality BMPs

Project Partners


Other Similar Projects

West Milton Dam Removal & Stillwater River Restoration
|

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as…

Read More
Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
Bluegrass Station
|

With the increase in projects aimed at re-establishing the health and stability of our waterways there has been a growing need for competent…

Read More