Skip to main content
Loading...

It began with a search for water that disappeared from the landscape.

We were looking to uncover and restore a historic spring that was once part of the Henry Clay estate. This had been the namesake for Clays Spring Park. The project began with a group of neighbors who remembered the park’s spring and wanted to revive the most significant feature on this property. Funding was provided by Lexington’s 5th Council District Representative Bill Farmer to restore the spring.

The first phase was finding where the water was. When the subdivision was developed, concrete pipes were run through the park to convey stormwater drainage from surrounding streets and properties. Small seams and gaps between these pipes were allowing some of the spring water to enter and flow through the stormwater system.

Key Features:

  • Historic spring uncovered
  • Dry laid stone spring box
  • Stormwater quality improvements
  • Aesthetic park improvement

Funding Source

Project Partners

  • EcoGro

  • LFUCG Parks and Recreation


Other Similar Projects

Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
Sunny Slope Farms
|

Originally purchased by the Sunny Slope Farms Homeowner’s Association in 2018, this riparian greenway sits on a 1.6-acre buffer between the

Read More
Lexington Green
|

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the…

Read More