Skip to main content
Loading...

Slope Stabilization

First Alliance Church was having difficulty maintaining a steep section of turf next to a newly constructed detention pond. The exposed soil was eroding and runoff from the church parking lot was cutting rills down the hill. EcoGro was consulted and recommended seeding the area with native flowers and grasses to control the erosion, minimize the maintenance, make it more attractive, and provide a habitat for wildlife.

Key Features:

  • Design/build
  • Compost erosion controls
  • Soil bioengineering
  • Native plants


Other Similar Projects

UK Alumni Drive Stream Restoration
|

To combat a storm water problem on University of Kentucky’s campus, the Stantec / Ridgewater / Bell Engineering / EcoGro team designed and then…

Read More
UK Stadium View
|

It’s unusual to find a modern facility with a coal pile these days. Even rarer is an urban stormwater project built to treat it. The University…

Read More
Vaughn's Branch
|

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The…

Read More