Rain Garden and Stormwater Drainage Improvements

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater improvements at its Wichita Kansas distribution facility. The property had suffered from persistent problems with runoff. Issues ranged from leaks along roof valleys, undersized downspout pipes and standing water in loading dock wells. The EcoGro team upgraded the drainage system and included a massive ¾ acre rain garden. This stormwater BMP is built to treat runoff from nearly 8 acres of the property’s impervious surfaces. A selection of native Kansas grasses and wildflowers will filter out non-point pollutants washing off the asphalt parking lot, sidewalks and rooftop.

Key Features:

  • Design and construction
  • Site drainage Improvements
  • Runoff reduction
  • Water quality BMPs

Project Partners


Other Similar Projects

Coca-Cola Stormwater Replenish Project
|

To continue Coca-Cola’s commitment to clean water, the Lexington Coca-Cola facility was awarded a grant from the city of Lexington to expand water…

Read More
Mower Tract Mine Restoration
|

Throughout Appalachia, the effects of surface mines are apparent across the landscape. These lands were once some of the most biologically diverse…

Read More
Vaughn's Branch
|

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The…