Rain Garden and Stormwater Drainage Improvements

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater improvements at its Wichita Kansas distribution facility. The property had suffered from persistent problems with runoff. Issues ranged from leaks along roof valleys, undersized downspout pipes and standing water in loading dock wells. The EcoGro team upgraded the drainage system and included a massive ¾ acre rain garden. This stormwater BMP is built to treat runoff from nearly 8 acres of the property’s impervious surfaces. A selection of native Kansas grasses and wildflowers will filter out non-point pollutants washing off the asphalt parking lot, sidewalks and rooftop.

Key Features:

  • Design and construction
  • Site drainage Improvements
  • Runoff reduction
  • Water quality BMPs

Project Partners


Other Similar Projects

Lee's Branch
|

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was…

Read More
Avey's Run
|

EcoGro was hired to help improve habitat quality on natural area owned by the Cincinnati Nature Center. EcoGro installed erosion controls and native…

Read More
Mill Creek
|

Fayette County Public Schools had the vision to improve 700 feet of Mill Creek in Lexington, Kentucky. The stream was an eroding, urban ditch that…

Read More