Rain Garden and Stormwater Drainage Improvements

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater improvements at its Wichita Kansas distribution facility. The property had suffered from persistent problems with runoff. Issues ranged from leaks along roof valleys, undersized downspout pipes and standing water in loading dock wells. The EcoGro team upgraded the drainage system and included a massive ¾ acre rain garden. This stormwater BMP is built to treat runoff from nearly 8 acres of the property’s impervious surfaces. A selection of native Kansas grasses and wildflowers will filter out non-point pollutants washing off the asphalt parking lot, sidewalks and rooftop.

Key Features:

  • Design and construction
  • Site drainage Improvements
  • Runoff reduction
  • Water quality BMPs

Project Partners


Other Similar Projects

FCPS Stormwater
|

Following the completion of previous projects at a few Lexington schools, our project  team of EcoGro,  Ridgewater and Stantec Consulting…

Read More
Woodfield Pond
|

EcoGro was contracted by the Woodfield Homeowners Association to provide an attractive solution to address an eroding pond edge. A large volume of…

Read More
Coldstream Park
|

The Cane Run watershed is designated as a resource protection area that feeds the drinking water supply for the city of Georgetown. As a 303d-listed…

Read More