Skip to main content
Loading...

Stormwater Best Management Practices

The purpose of this project was to implement a variety of stormwater Best Management Practices (BMPs) to improve water quality in Cane Run at the Kentucky Horse Park. The park was selected as a key location to implement and demonstrate practical ways to reduce pollution in Cane Run. The quality of water in Cane Run is listed by the Kentucky Division of Water as impaired due to pollutants such as sediment, excessive nutrients, manure and urban runoff. Stormwater quality improvements in this area will benefit Cane Run and the Royal Springs Aquifer (which serves as the drinking supply water for the City of Georgetown). EcoGro was hired to assist with BMP selection, design and construction. 

Key Features:

  • Design / Build
  • Pond dredging
  • Stream bank grading
  • Bioretention basins
  • Funding for this project was provided by an EPA 319 grant to implement water quality improvements in the Cane Run Watershed.

Other Similar Projects

South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More
Dixie Park Feasibility
|

The project team of EcoGro, Ridgewater and Stantec was hired by LFUCG Division ofEnvironmental Services to develop a conceptual plan for a small…

Read More
Centenary Stormwater Improvement
|

entenary Church is situated on 13 acres of mostly impervious surface draining into the West Hickman Creek watershed. Due to aging/failing stormwater…

Read More