Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

Vaughn Branch
|

On February 9th, 2022, EcoGro began work for Woods & Water Land Trust on management of invasive brush within a remote section of Vaughn Branch…

Read More
Town Branch Phase I
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More