Skip to main content
Loading...

Constructed Wetland

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a compost filter cell in the existing basin. The purpose was to force the water entering to navigate completely through the system, creating a longer hydraulic residence time and allowing for more deposition, filtration, vegetative uptake and bioremediation.

Key Features:

  • Compost-based products
  • Water quality BMP

Other Similar Projects

UK Maine Chance Farm
|

EcoGro was hired to construct ecological enhancements along approximately 850 linear feet of an un-named tributary to Cane Run at the University of…

Read More
Blue Ridge Landfill
|

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a…

Read More
Mower Tract Mine Restoration
|

Throughout Appalachia, the effects of surface mines are apparent across the landscape. These lands were once some of the most biologically diverse…

Read More