Stormwater Solutions

Key Features:

  • Stacked rock headwalls
  • Design / Build stream channel
  • Native riparian planting
  • Pollinator habitat
  • Ongoing stewardship of riparian planting

The city of Lexington’s Division of Parks and Recreation needed to address an eroding stormwater channel in the city’s newest public park. This property had previously been the staging area for the installation of a new sanitary sewer pump station. During the many months of construction activities, heavy equipment and piles of materials had compacted and smothered the soil. As a result, a protective cover of truf grass was difficult to establish after construction was finished. During the course of a few months, a shallow drainage ditch had eroded into a deep gully. Soil that washed out of the channel was accumulating in new stormwater structures downstream.

EcoGro was hired by Parks and Recreation to mitigate the eroding gully by installing stacked limestone boulders at headwalls, a rock conveyance and infiltration channel, a buffer of native grasses and wildflowers, nine shade trees for park amenities and prepare an area for future reforestation events. Our scope of work included three full growing seasons of stewardship to control weeds, monitor progress and ensure the planting is fully established.


Project Partners

  • LFUCG

Funding Partner


Other Similar Projects

Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
Winburn
|

Any property in an urban environment is going to receive stormwater, and every property should be designed to safely convey that stormwater away…

Read More
UK Alumni Drive Stream Restoration
|

To combat a storm water problem on University of Kentucky’s campus, the Stantec / Ridgewater / Bell Engineering / EcoGro team designed and then…

Read More