Skip to main content
Loading...

Stormwater Solutions

The city of Lexington’s Division of Parks and Recreation needed to address an eroding stormwater channel in the city’s newest public park. This property had previously been the staging area for the installation of a new sanitary sewer pump station. During the many months of construction activities, heavy equipment and piles of materials had compacted and smothered the soil. As a result, a protective cover of truf grass was difficult to establish after construction was finished. During the course of a few months, a shallow drainage ditch had eroded into a deep gully. Soil that washed out of the channel was accumulating in new stormwater structures downstream.

EcoGro was hired by Parks and Recreation to mitigate the eroding gully by installing stacked limestone boulders at headwalls, a rock conveyance and infiltration channel, a buffer of native grasses and wildflowers, nine shade trees for park amenities and prepare an area for future reforestation events. Our scope of work included three full growing seasons of stewardship to control weeds, monitor progress and ensure the planting is fully established.

Key Features:

  • Stacked rock headwalls
  • Design / Build stream channel
  • Native riparian planting
  • Pollinator habitat
  • Ongoing stewardship of riparian planting

Project Partners

LFUCG

Funding Partner


Other Similar Projects

McConnells Spring
|

McConnells Spring Park is a designated Natural Areas Park in the heart of Lexington. The karst features that allow water to spring to the surface…

Read More
Lexmark Bioretention
|

The combination of impervious roof areas and parking lots on the 264 acre campus produce significant stormwater volume and water quality…

Read More
Williamsport
|

The purpose of this project was to restore critical habitat for freshwater mussels in Deer Creek, located in southern Ohio. This project was funded…

Read More