Slope Stabilization

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was installed along 400 feet of an eroded streambank. However, due to site limitations, the designers also needed a product to stabilize the steep, bare slope without removing existing trees. A compost-based “Living Wall” application was selected to establish vegetation and stabilize the slope.

Key Features:

  • Bioengineering
  • Bank stabilization
  • Filtrexx® Filtersoxx living wall
  • BFM hydroseeding

Other Similar Projects

Sunny Slope Farms
|

Originally purchased by the Sunny Slope Farms Homeowner’s Association in 2018, this riparian greenway sits on a 1.6-acre buffer between the

Read More
Valley Park Stream Crossing
|

With citizens constantly crossing through the creek and a new sewer running under the creek, the stream crossing at Valley Park was a much needed…

Read More
Green Acres Stream Buffer Enhancement
|

For many years, residents in the Green Acres and Hollow Creek neighborhoods had experienced a variety of flooding, sanitary sewer and storm water…

Read More