Skip to main content
Loading...

Slope Stabilization

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was installed along 400 feet of an eroded streambank. However, due to site limitations, the designers also needed a product to stabilize the steep, bare slope without removing existing trees. A compost-based “Living Wall” application was selected to establish vegetation and stabilize the slope.

Key Features:

  • Bioengineering
  • Bank stabilization
  • Filtrexx® Filtersoxx living wall
  • BFM hydroseeding

Other Similar Projects

Dartmoor
|

Beginning August 2022, Lexington-Fayette Urban County Government (LFUCG) has awarded annual stewardship contracts to EcoGro to manage the city-owned…

Read More
Coca-Cola Bottle Rain Garden
|

The Coca Cola rain garden is the first rain garden registered in the Bluegrass Rain Garden Alliance's "2,010 Rain Gardens by 2010" initiative. …

Read More
Mill Creek Elementery
|

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality…

Read More