Skip to main content
Loading...

Slope Stabilization

EcoGro was contacted to provide stabilization solutions for an eroded stream bank. During the restoration construction process a rock toe was installed along 400 feet of an eroded streambank. However, due to site limitations, the designers also needed a product to stabilize the steep, bare slope without removing existing trees. A compost-based “Living Wall” application was selected to establish vegetation and stabilize the slope.

Key Features:

  • Bioengineering
  • Bank stabilization
  • Filtrexx® Filtersoxx living wall
  • BFM hydroseeding

Other Similar Projects

Springs Branch at Clays Mill Elementary
|

EcoGro, Fayette County Public Schools, and several project partners submitted a grant application for the LFUCG Stormwater Quality Incentive Grant…

Read More
Gunpowder Creek
|

The Gunpowder Creek dam was originally constructed to serve as a water supply reservoir for the Camp Michaels Boy Scout Camp in Boone County,…

Read More
UK Alumni Drive Stream Restoration
|

To combat a storm water problem on University of Kentucky’s campus, the Stantec / Ridgewater / Bell Engineering / EcoGro team designed and then…

Read More