Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

The project team of EcoGro, Ridgewater and Stantec was hired by LFUCG Division of Environmental Services to develop a conceptual plan for a small urban stream in a city park. Our assignment was to assess the conditions and options for nearly 600 linear feet of this tributary for West Hickman Creek. The site is adjacent to a public school and the walkways through the park provide pedestrian access for students and parents. The first concern was to mitigate potential safety issues of eroded stream banks (nearly 4 feet vertical drop) beside the edge of a public walkway.


Project Partners

funding Partner


Other Similar Projects

Falling Leaves Greenway
|

The need and appreciation for greenways in neighborhoods is increasing. Plus, a growing number of people understand how greenspaces serve as…

Read More
South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More
Crooked Creek
|

Crooked Creek, a tributary to the Tennessee River, was selected by the Tennessee Stream Mitigation Program for restoration. EcoGro was hired as a…

Read More