Skip to main content
Loading...

Pond Bank Stabilization

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the pond had eaten away most of the turf grass and were leaving a mess with their droppings. The result was a case of very poor water quality. Decorative Kentucky native plants along the banks offer a prime example of restoring a balance for sediment control, nutrient management and water quality. The Lexington Green bank stabilization project shows that EcoGro can offer much more than what meets the eye.

Key Features:

  • Design/build
  • Bank stabilization
  • Water Quality
  • Native plants
  • Biodegradable products

Awards

LFUCG Environmental Commission Award


Other Similar Projects

Mower Tract Mine Restoration
|

Throughout Appalachia, the effects of surface mines are apparent across the landscape. These lands were once some of the most biologically diverse…

Read More
Eastland
|

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated…

Read More
Coldstream Dog Park
|

In 2023, EcoGro was hired to remove invasive plants from a 6-acre stream buffer at Coldstream Park. This particular location along a historic…

Read More