Pond Bank Stabilization

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the pond had eaten away most of the turf grass and were leaving a mess with their droppings. The result was a case of very poor water quality. Decorative Kentucky native plants along the banks offer a prime example of restoring a balance for sediment control, nutrient management and water quality. The Lexington Green bank stabilization project shows that EcoGro can offer much more than what meets the eye.

Key Features:

  • Design/build
  • Bank stabilization
  • Water Quality
  • Native plants
  • Biodegradable products

Awards

LFUCG Environmental Commission Award


Other Similar Projects

219 E Vine
|

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington.

Read More
UK Stadium View
|

It’s unusual to find a modern facility with a coal pile these days. Even rarer is an urban stormwater project built to treat it. The University…

Read More
Lexmark Shadybrook Park
|

This project consisted of repairing the banks of a section of Cane Run and a section of a tributary to Cane Run flowing through Shadybrook Park,…

Read More