Skip to main content
Loading...

Pond Bank Stabilization

The Mall at Lexington Green had been suffering from erosion along its pond banks for several years. The numerous geese that were attracted to the pond had eaten away most of the turf grass and were leaving a mess with their droppings. The result was a case of very poor water quality. Decorative Kentucky native plants along the banks offer a prime example of restoring a balance for sediment control, nutrient management and water quality. The Lexington Green bank stabilization project shows that EcoGro can offer much more than what meets the eye.

Key Features:

  • Design/build
  • Bank stabilization
  • Water Quality
  • Native plants
  • Biodegradable products

Awards

LFUCG Environmental Commission Award


Other Similar Projects

Mill Creek Elementery
|

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality…

Read More
South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More
First Alliance Church
|

First Alliance Church was having difficulty maintaining a steep section of turf next to a newly constructed detention pond. The exposed soil was…

Read More