Skip to main content
Loading...

Erosion and Sediment Control

Crooked Creek, a tributary to the Tennessee River, was selected by the Tennessee Stream Mitigation Program for restoration. EcoGro was hired as a subcontractor to install Filtrexx® sediment control structures, coir erosion control blanket and straw mulch as well as native grass, wildflower and annual cover crop seed.

Key Features:

  • Riparian buffer
  • Native plants
  • Filtrexx® compost socks
  • Biodegradable erosion control products


Other Similar Projects

West Milton Dam Removal & Stillwater River Restoration
|

The West Milton dam was constructed in 1910 to generate electricity for the trolley that went from Dayton to West Milton, Ohio and was later used as…

Read More
Idle Hour Park
|

The design/build team of EcoGro, Stantec and Ridgewater was hired by the city ofLexington’s Division of Environmental Services to assess an eroding…

Read More
Coldstream Dog Park
|

In 2023, EcoGro was hired to remove invasive plants from a 6-acre stream buffer at Coldstream Park. This particular location along a historic…

Read More