Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was contracted to hydroseed native wildflower seeds on a 4+ acre stream restoration project conducted by another company. After work on the new stream channel and floodplain was complete EcoGro hydroseeded disturbed areas to be re-vegetated.

Key Features:

  • Hydroseeding
  • Native plants
  • Riparian buffer

Other Similar Projects

South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More
Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
219 E Vine
|

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington.

Read More