Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was hired to help improve habitat quality on natural area owned by the Cincinnati Nature Center. EcoGro installed erosion controls and native seed as well as removed invasive plants in conjunction with the restoration of Avey’s Run, a tributary to the East Fork Little Miami River. This project was funded by a grant funded by Ohio Division of Water Section 319 Nonpoint Source Program and coordinated by the Clermont Soil and Water Conservation District and the East Fork Watershed Collaborative.

Key Features:

  • Riparian buffer
  • Native plants
  • 100% Biodegrable erosion control blanket
  • Invasive species removal

Project Files:

Avey's Run Project Profile

 



Other Similar Projects

Vaughn's Branch
|

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The…

Read More
219 E Vine
|

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington.

Read More
Clays Spring Park
|

It began with a search for water that disappeared from the landscape. We were looking to uncover and restore a historic spring that was once part of…

Read More