The EcoGro, Ridgewater, Stantec Team worked to develop a stream mitigation project at the tailwaters of Lake Cumberland. The goal of this Design/Build project is to create Stream and wetland mitigation credits for KDFWR, with one other goal of creating a self-sustaining trout population. Water that feeds into the USFWS Wolf Creek National Fish Hatchery will now flow through nearly 6,000 linear feet of new stream channel and wetlands.  

Key Features:

  • Design / Build
  • Stream and Wetland Construction
  • Trout Habitat
  • Fish Passage from Cumberland River

Contact Us

All the fields are required

Project Team

Project Partners


Other Similar Projects

Town Branch Phase II
|

The purpose of this project was to lengthen and restore 5,862 feet of degraded channel in Town Branch at Winchester, KY. This Clark County tributary…

Read More
McConnells Spring
|

McConnells Spring Park is a designated Natural Areas Park in the heart of Lexington. The karst features that allow water to spring to the surface…

Read More
Sruth Fuisce Feasibility study
|

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and costestimate for improvements to a large pond in the Licking River…

Read More