Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

McConnell's Trace
|

The McConnells Trace Greenway Improvements project offers a new perspective on incorporating a healthy ecosystem into our neighborhoods. McConnells…

Read More
Hatchery Creek
|

The EcoGro, Ridgewater, Stantec Team worked to develop a stream mitigation project at the tailwaters of Lake Cumberland.

Read More
Crooked Creek
|

Crooked Creek, a tributary to the Tennessee River, was selected by the Tennessee Stream Mitigation Program for restoration. EcoGro was hired as a…

Read More