Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Coldstream Park
|

The Cane Run watershed is designated as a resource protection area that feeds the drinking water supply for the city of Georgetown. As a 303d-listed…

Read More
UK Alumni Drive Stream Restoration
|

To combat a storm water problem on University of Kentucky’s campus, the Stantec / Ridgewater / Bell Engineering / EcoGro team designed and then…

Read More
Sunny Slope Farms
|

Originally purchased by the Sunny Slope Farms Homeowner’s Association in 2018, this riparian greenway sits on a 1.6-acre buffer between the

Read More