Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Kentucky Horse Park Stormwater BMPS
|

The purpose of this project was to implement a variety of stormwater Best Management Practices (BMPs) to improve water quality in Cane Run at the…

Read More
Coca-Cola Bottle Rain Garden
|

The Coca Cola rain garden is the first rain garden registered in the Bluegrass Rain Garden Alliance's "2,010 Rain Gardens by 2010" initiative. …

Read More
Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More