Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Eureka Springs
|

It’s typical to see old stormwater basins with only mowed of turf grass and the occasional concrete flume along the bottom. In the early days of…

Read More
Vaughn's Branch
|

The purpose of this project was to provide a green technique for stabilizing an eroding streambank in conjunction with infrastructure upgrades. The…

Read More
Hartland Stream Restoration
|

Hartland Homeowners Association worked with Earthcycle Design to submit a proposalto rebuild a section of stream that was overgrown with invasive…

Read More