Skip to main content
Loading...

Erosion and Sediment Control

EcoGro was sub-contracted to install an in-stream sediment check dam during channel excavation using Filtrexx® compost Filtersoxx. A designated riparian buffer area along the banks of the stream was seeded with native grasses and wildflowers. The exposed soil was then covered with erosion control blanket. EcoGro was able to provide ongoing maintenance and monitoring of the restoration to ensure successful habitat establishment.

Key Features:

  • Filtrexx® Filtersoxx
  • Bank stabilization
  • Urban hydrology
  • Native wildflowers
  • Riparian buffer
  • Maintenance
  • Biodegradable erosion control blanket

Project Files:

Eastland Project Profile

Related Links: 


Other Similar Projects

Buckhorn Park
|

The city of Lexington’s Division of Parks and Recreation needed to address an eroding stormwater channel in the city’s newest public park. This…

Read More
Clays Spring Park
|

It began with a search for water that disappeared from the landscape. We were looking to uncover and restore a historic spring that was once part of…

Read More
South Fork Curry's Fork
|

The purpose of this project was to mitigate stream losses in the Salt River Basin by restoring approximately 3,734 ft of South Fork Curry’s Fork and…

Read More