Skip to main content
Loading...

Rain Garden and Stormwater Drainage Improvements

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater improvements at its Wichita Kansas distribution facility. The property had suffered from persistent problems with runoff. Issues ranged from leaks along roof valleys, undersized downspout pipes and standing water in loading dock wells. The EcoGro team upgraded the drainage system and included a massive ¾ acre rain garden. This stormwater BMP is built to treat runoff from nearly 8 acres of the property’s impervious surfaces. A selection of native Kansas grasses and wildflowers will filter out non-point pollutants washing off the asphalt parking lot, sidewalks and rooftop.

Key Features:

  • Design and construction
  • Site drainage Improvements
  • Runoff reduction
  • Water quality BMPs

Project Partners


Other Similar Projects

Mill Creek Elementery
|

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality…

Read More
Montessori Middle School of Kentucky
|

The purpose of this project is to improve water quality and reduce stormwater runoff in the South Elkhorn watershed. In addition, the project will…

Read More
Deauville Bush Honeysuckle Removal
|

The control of bush honeysuckle is one of the biggest battles in the Bluegrass region of Kentucky. The LFUCG Department of Environmental Quality and…

Read More