Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

Following years of urban expansion in Lexington, the South Elkhorn Creek was suffering from “urban stream syndrome”. In combination with more extreme hydrology and poorer water quality, banks had eroded to the point where it had become a safety concern. Those most concerned were residents who were losing their backyards to steep, vertical banks in excess of six feet height. To address increasing issues within the watershed, residents formed Neighbors United for South Elkhorn Creek (NUSEC). Although this group of volunteers were able to recognize the scale of impacts, they didn’t have the capacity to address them fully with sustainable results.

Project Files:

NUSEC feasibility study


Project Partners

Funding Partners


Other Similar Projects

Blue Ridge Landfill
|

EcoGro was contacted to provide assistance on a constructed wetlands site at the Blue Ridge landfill facility in Irvine, KY. EcoGro installed a…

Read More
Coca-Cola Wichita
|

Continuing from successful stormwater BMPs installed at its Lexington facility, Coca Cola hired EcoGro to design and construct stormwater…

Read More
Eureka Springs
|

It’s typical to see old stormwater basins with only mowed of turf grass and the occasional concrete flume along the bottom. In the early days of…

Read More