Skip to main content
Loading...

It began with a search for water that disappeared from the landscape.

We were looking to uncover and restore a historic spring that was once part of the Henry Clay estate. This had been the namesake for Clays Spring Park. The project began with a group of neighbors who remembered the park’s spring and wanted to revive the most significant feature on this property. Funding was provided by Lexington’s 5th Council District Representative Bill Farmer to restore the spring.

The first phase was finding where the water was. When the subdivision was developed, concrete pipes were run through the park to convey stormwater drainage from surrounding streets and properties. Small seams and gaps between these pipes were allowing some of the spring water to enter and flow through the stormwater system.

Key Features:

  • Historic spring uncovered
  • Dry laid stone spring box
  • Stormwater quality improvements
  • Aesthetic park improvement

Funding Source

Project Partners

  • EcoGro

  • LFUCG Parks and Recreation


Other Similar Projects

Idle Hour Park
|

The design/build team of EcoGro, Stantec and Ridgewater was hired by the city ofLexington’s Division of Environmental Services to assess an eroding…

Read More
Mill Creek Elementery
|

In conjunction with the Mill Creek stream restoration, multiple wetlands were constructed to provide both aquatic habitat diversity and water quality…

Read More
Sruth Fuisce Feasibility study
|

Ecogro was hired by a Paris horse farm owner to conduct a feasibility study and costestimate for improvements to a large pond in the Licking River…

Read More