Skip to main content
Loading...

DESIGN / FEASIBILITY STUDY

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington. The client’s concern centered on stormwater from parking lots and buildings appeared to have been routed towards an old limestone retaining wall running along Vine Street. Following heavy rains, water had been observed flowing over the wall as well as seeping out of cracks and gaps. It was unclear as to where water was going, the existence and condition of stormwater infrastructure, as well as the boundaries of the work area. We recommended a stormwater feasibility study to answer these questions. In 2022, EcoGro partnered with Stantec Consulting Services to develop and submit a stormwater grant application.


Project Partners

Funding Partners


Other Similar Projects

Pond Creek
|

Pond Creek in Crockett County, Tennessee resembled a straightened ditch. A section of private property was acquired by the West Tennessee River Basin…

Read More
219 E Vine
|

EcoGro was contacted by Dr. Tuttle to assess a situation involving stormwater runoff from a historic property in the heart of downtown Lexington.

Read More
Sruth Fuisce Pond
|

Few know the importance of water more than the modern farmer. Besides the need for drinking water, there are many benefits to increasing water…

Read More